Shopping Center Zrenjanin – Roof Penetration Waterproofing
- 09.07.2020.
- -
At the shopping center in Zrenjanin, roof leakage occurred in the area of roof installation penetrations. Specifically, a bundle of installation cables and pipes was pulled onto the roof but was not properly waterproofed. The repair solved the problem of leakage – water passing through the roof penetrations for external air conditioning units. Below are […]
OpširnijeBusiness facility Ametek Subotica – Roof Penetration Waterproofing
- 02.07.2020.
- -
At the business facility “Ametek” in Subotica, repair of roof ventilation pipes (roof penetrations) was carried out due to leakage occurring at these points caused by poorly executed details with the waterproofing membrane. Below are photos before the repair and after the repair of the roof penetration waterproofing.
OpširnijeProduction facility “MetalFlex” Nova Pazova – repair of the flat roof
- 17.06.2020.
- -
At the production facility in Nova Pazova, a repair of a section of the roof was performed by installing waterproofing “Sikaplan 15G”. The repair was carried out on a part of the roof where leakage, or water seepage through the existing roof covering, frequently occurred. The approximate area that was repaired is P=250m2. Below, you […]
OpširnijeBusiness facility – “Coca Cola” – Waterproofing of roof domes
- 09.06.2020.
- -
At the “Coca Cola” facility in Zemun, the skylights on the roof were treated with the waterproofing membrane “Sikaplan 15G”. This membrane was connected to the existing roof waterproofing using a liquid waterproofing membrane – a single-component polyurethane coating “Sikalastic 641”. The base was prepared with appropriate primers (“PVC Primer” and “EPDM Primer”) according to […]
OpširnijeRoof waterproofing repair – residential building in Batajnica
- 23.03.2020.
- -
A part of the roof of the residential building in Batajnica has been repaired by installing thermal insulation “Fragmat EPS 150” and waterproofing “Sikaplan 15 G”. The total waterproofed area is approximately P=160m2. Attached are photos showing the progress of the work during construction as well as after completion of the waterproofing work.
OpširnijeCommercial building – Tim Pharma Ltd. Šabac – Repair of the roof
- 13.03.2020.
- -
The waterproofing of a section of the roof of the commercial building ‘Tim Pharma’ Ltd. in Šabac has been completed. Insulation ‘SmartRoof Thermal’ was applied to the existing roof panel, which was leaking at several points, to fill the gaps between the roof panel joints, with ‘Smart Roof Top’ used as a leveling layer, resulting […]
OpširnijeBosch Šimanovci – waterproofing of the roof penetrations
- 12.12.2019.
- -
Investments are being made, production capacities are being expanded, and new production units are being implemented at the “Bosch” production complex in Šimanovci and for these reasons it is necessary to cut the roof cover for the penetration of installation channels, pipes or lines. “DVS Izolacija” d.o.o. participated in the construction of a new production […]
OpširnijeWaterproofing with liquid waterproofing “Sikalastic 641”
- 16.11.2019.
- -
Processing of joints – details of roof waterproofing, which cannot be treated with a waterproofing membrane or is difficult to do, a liquid waterproofing membrane is used – one-component polyurethane coating “Sikalastic 641”. Technology of applying waterproofing coating: 1. Preparation of the substrate, cleaning of waste material, dust and degreasing. 2. Applying the primer to […]
OpširnijeBall Packaging – Buidling B2 – Strengthening of the lightning rod installation holders
- 30.09.2019.
- -
According to the request of the lightning rod installation contractor, the fastening of the lightning rod holders was carried out at the “Object B2” production facility in “Ball Packaging” complex in Zemun. The lightning protection installation is placed on typical holders for a flat roof. Flat roofs with synthetic membranes are most often made with […]
OpširnijeFoundation waterproofing – residential building – Belgrade
- 20.09.2019.
- -
The installation of the PVC waterproofing membrane “Sikaplan 9.6. (Sikaplan WP 1100-15HL)” on buried part of the structure of the building – underground waterproofing of the foundation – was carried out on the residential building.The approximate square footage of the installed waterproofing membrane on the vertical foundation walls is about P=200 m2.
Opširnije01. Search
02. Last Posts
03. Tags
- BIRD DETERRENT (2)
- Certificate (2)
- DVS Izolacija (1)
- Foundation waterproofing (1)
- FPO (3)
- G-15 (10)
- G-18 (1)
- HOLIDAY (1)
- Hydro isolation (4)
- LABOR DAY (1)
- Lighting Protection (1)
- Lightning Protection (1)
- Lightning rod instalation (1)
- liquid membrane (4)
- Maintenance (1)
- MAY 2023 (1)
- Metal Flashings (1)
- Mineral wool (1)
- Our works (6)
- Overflow (1)
- Penetration (1)
- Penetrations (2)
- Pipes (1)
- PIR (4)
- Projects (118)
- Protection (1)
- PVC (6)
- REPAIR (11)
- Residental (1)
- Roof (25)
- Roof Penetrations (2)
- Sandwich Panels (1)
- Sarnafil (2)
- Sikalastic (2)
- Sikalastic 641 (2)
- SIKAPLAN (17)
- sikatherm (2)
- Stone Wool (4)
- Terrace (2)
- Thermal insulation (33)
- Thermal isolation (9)
- UNIROOF (1)
- Ventilation ducts (1)
- Waterproofing (153)
- XPS (2)




