Production Facility – Kikinda Foundry – Gutter Waterproofing
- 27.03.2023.
- -
At the production facility – Kikinda Foundry, we carried out waterproofing works on the gutters. The installation of the PVC waterproofing membrane ‘Sikaplan 15G‘ was successfully completed. The total length of the renovated gutters is approximately 400 meters. However, the width of the gutters varies, with some sections being as narrow as 40-50 cm, posing […]
Opširnije01. Search
02. Last Posts
03. Tags
- BIRD DETERRENT (2)
- Certificate (2)
- DVS Izolacija (1)
- Foundation waterproofing (1)
- FPO (3)
- G-15 (10)
- G-18 (1)
- HOLIDAY (1)
- Hydro isolation (4)
- LABOR DAY (1)
- Lighting Protection (1)
- Lightning Protection (1)
- Lightning rod instalation (1)
- liquid membrane (4)
- Maintenance (1)
- MAY 2023 (1)
- Metal Flashings (1)
- Mineral wool (1)
- Our works (6)
- Overflow (1)
- Penetration (1)
- Penetrations (2)
- Pipes (1)
- PIR (4)
- Projects (118)
- Protection (1)
- PVC (6)
- REPAIR (11)
- Residental (1)
- Roof (25)
- Roof Penetrations (2)
- Sandwich Panels (1)
- Sarnafil (2)
- Sikalastic (2)
- Sikalastic 641 (2)
- SIKAPLAN (17)
- sikatherm (2)
- Stone Wool (4)
- Terrace (2)
- Thermal insulation (33)
- Thermal isolation (9)
- UNIROOF (1)
- Ventilation ducts (1)
- Waterproofing (153)
- XPS (2)