- 10.03.2020.
- -
The new equipment has been installed and the opening of the roof layers at the passage points of installation pipes and load-bearing steel profiles has been carried out at the business facility – shopping center “BIG Shopping Center” in Novi Sad.
After the installation of the pipes and steel profiles, waterproofing of the new roof penetrations has been completed and welded to the basic roof waterproofing.







