At a commercial building in Nova Pazova, a waterproofing system was installed to seal the level transition between a new and existing roof.

The new roof was finished with a waterproofing membrane, while the existing structure had a metal panel roof.

The transition was sealed by welding the waterproofing membrane onto the higher roof’s parapet and securing it onto the lower roof panels with PVC trim profiles. These profiles were then sealed with silicone at the connection points with the metal panels.

The installation followed the manufacturer’s technical recommendations and standard details, ensuring durability and reliability.