- 09.02.2021.
- -
At the ‘Sinofarm‘ warehouse facility in Stara Pazova, roof repair work was carried out.
A steel substructure made of metal strips was installed on the roof and fixed to the trapezoidal roofing sheets. Thermal insulation with a thickness of d=6 cm was then applied as a leveling layer, followed by the installation of the ‘Sikaplan 15G‘ waterproofing membrane.
The total area of the repaired roof is approximately P=1,700 m².
Attached are photographs of the roof before the work, during the execution of the work, and after the completion of the repairs.