- 26.11.2021.
- -
At the commercial building, the repair of metal valleys – horizontal gutters for roof water management – has been completed.
The repair was necessary due to multiple leaks in the existing metal gutters.
Geotextile and waterproofing membrane ‘Sikaplan 15 G‘ were installed in the gutters.
The total area of the repaired gutters is approximately P=240 m².
Attached are photos taken during and after the completion of the work.













