At a private house in Indjija, the installation of thermal insulation was carried out with a slope to create a roof pitch (installation of tapered thermal insulation), followed by the placement of waterproofing as the final layer of the non-walkable flat roof.

After the installation of thermal and waterproofing insulation, a hydrotest was conducted by pouring water onto the roof to test the waterproofing. Water was left on the roof for 4 days, demonstrating the quality of the workmanship as there was no leakage or moisture observed on the interior side of the roof panel.

Below are photos taken during the installation of thermal insulation and the placement of waterproofing.